The sport facilities, which were constructed in 1989 and 1990, were used from several sport clubs...
After 60 years of operation, the 250 meter long sewer with around 18 house connections shows heavy...
29.03.2012, ground-breaking ceremony to expand the existing WWTP from 4,000 to 10,000 PE. All in...
The railway bridge over the river Krems connecting the town Kremsdorf and Nettingsdorf at the...
The concrete works at the secondary settlement basin with a diameter of 16 meter and a volume of...





